Overview
Location

Nairobi. Kenya

Period

2024 - Ongoing

Project overall cost

KES 68 Million

Project status

2024 - Design Stage

Proposed Makini School Classrooms, Labs, Hall & Offices

Our Scope
  •  Electrical, ICT and Security Installations
  •  Plumbing & Drainage
  •  Fire detection and Fighting Systems
  •  HVAC systems
  •  Solar Lighting
  •  Waste Water Management
  •  Borehole Drilling and Equipping
  •  Generator
  •  Kitchen equipment
  •  Swimming pool
  •  LPG gas for the lab
  •  Water treatment
  •  Wastewater treatment

    Architects: HofMan (South Africa)
    Name of the Client: ADvTECH Group
    MEP Engineers: Kayzen MEP Engineers Ltd sub consultant for Beuraco Engineering